The Town of Cobourg has many “Master Plans” detailing what should be done on various assets and areas. The plans include goals and timelines intended to guide staff but in general, there are no regular reports on whether the goals are being met or indeed if there is any progress. I have made a list of the plans below.
There are other related documents that have been produced but they are not “MASTER” plans. The Town lists these here (in addition to some of the Master Plans).
In the list below, the File Location is indicated. If it’s Cobourg Internet, that means it's hosted on this site and it will be available while the site continues to operate; if it’s the Town, then based on previous experience, the file may get lost when the Town’s web site is re-worked. I believe the Town plans an update of the web site in 2024.
Waterfront User Needs Assessment and Detailed Design
Date: May 2018
Consultant: thinc design
Town Web page: Waterfront User Needs Assessment
Link to PDF: Waterfront Study
PDF Size: 5.6MB
File Location: Cobourg Internet
Related Blog Reports: Harbour Repairs moving ahead slowly - 15 Dec 2022; Major Harbour Repairs required - 4 Dec 2020
Parks Master Plan
Date: May 2013
Consultant: Peter J. Smith and Company
Town Web page: Parks Master Plan
Link to PDF: Park Master Plan 2013
PDF Size: 21 MB
File Location: Cobourg Internet
Heritage Master Plan
Date: May 2016
Consultant: MHBC Planning
Town Web page: Heritage Master Plan
Link to PDF: Heritage Master Plan
PDF Size: 14.6MB
File Location: Cobourg Internet
Related Blog Report: Heritage Plan Review Surprises - October 2017
Downtown Master Plan
Date: Feb 2016
Consultant: Dillon Consulting and RCI Consulting
Town Web page: Downtown Vitalization Plan
Link to PDF: Downtown Master Plan Feb 2016
PDF Size: 10MB
File Location: Cobourg Internet
Related Blog Reports: Report on Downtown Vitalization to date - Feb 2019; Vitalization update - October 2017
Transportation (includes Transit)
Date: August 2011
Consultant: HDR | ITRANS
Town Web page: Transportation Master Plan
Link to PDF: Transportation Master Plan Part 1; Transportation Master Plan Part 2; Transportation Master Plan Part 3.
PDF Size: Part 1: 34MB; Part 2: 32 MB; Part 3: 34MB.
File Location: Town web site
Cultural
Date: October 2019
Consultant: MDB Insights
Town Web page: No web page for Culture
Link to PDF: Cultural Master Plan
PDF Size: 1.4MB
File Location: Cobourg Internet
Related Blog Report: Final Cultural Plan presented to Council - October 2019
Urban Forestry
Date: July 2018
Consultant: Kilgour & Associates Limited
Town Web page: Urban Forestry Management Plan
Link to PDF: Urban Forestry Management Plan
PDF Size: 6MB
File Location: Cobourg Internet
Related Blog Report: Urban Forest Management Plan Released - July 2018
Parking Capacity Study
Date: March 2024
Consultant: Paradigm Transportation Solutions
Town Web page: No page on 2023 Parking study
Link to PDF: DownTown Parking Study
PDF Size: 12 MB
File Location: Cobourg Internet
Related Blog Report: Downtown Parking Study says no Garage Needed - 22 April 2024
Fire Master 10 year Plan
Date: November 2022
Consultant: Emergency Management Group
Town Web page: Fire Department page - No mention of Fire Master Plan
Link to PDF: Fire Master Plan
PDF Size: 4.6MB
File Location: Cobourg Internet
Tannery District
Date: June 2021
Consultant: Fotenn Planning and Design and others
Town Web page: Tannery District
Link to PDF: Master Plan
PDF Size: 63 MB
File Location: Town Web site
Related Blog Report: Tannery Update - April 2023
Multi-Year Accessibility Plan
Date: 2021
Consultant: Town of Cobourg Accessibility Advisory Committee
Town Web Page: Accessibility
Link to PDF: Multi-Year Accessibility Plan 2020-2024
PDF Size: 2.5MB
File Location: Cobourg Internet
It's hoped that Town Staff do refer to these plans when deciding what to do but it would be nice to have confirmation of this. Some appear to be shelved (e.g. culture) - these should be dusted off - or else why bother with master plans?